A practice fire drill was conducted at Sg. Akar Batching Plant (P23) on 23rd October 2023, under the direction of Readymix HSE officer, Mr. Nur Fadzle. This fire drill’s goal is to familiarize and reinforce the best evacuation procedures. The objective is to have the proper actions be an automatic response whenever there is any emergency, so that everyone safely evacuates the area in an orderly manner.